Jump to main content

How should systems monitor during the interval between the end of IDSE monitoring and the beginning of Stage 2 DBPR compliance sampling? 

Systems must continue Stage 1 DBPR monitoring and could work with their primacy agency to begin Stage 2 DBPR compliance sampling earlier than required.  This interval is built into the Stage 2 DBPR to accommodate systems that may need to make large changes to their distribution system to meet the requirements of the Stage 2 DBPR.

For additional guidance on the Stage 2 Disinfectants and Disinfection Byproducts rule please visit http://water.epa.gov/lawsregs/rulesregs/sdwa/stage2/regulations.cfm.

Rating:Rating of 2 Stars104 Votes
Was this answer helpful?YesNo
Topic Information
  • Topic #: 23002-17830
  • Date Created: 3/10/2006
  • Last Modified Since: 3/19/2012
  • Viewed: 5835

Jump to main content.